Fittings Kit Includes:
- x2 120mm M10 Thru-bolts, x2 30mm M8 coach screws.
Our galvanized steel post shoe is designed to be resistant to exposure to the elements. By keeping the timber post above the ground level out of the damp areas and allowing the post foot to dry out after rain it helps prevent decay and prolong the life of the post. SWL 2549.29kg/25kn*
- The post base can be fixed to concrete using 2 No 100 mm x M10 thru-bolts, or may be concreted into the foundation.The timber post can be fixed to the post with two 40mm x 8mm coach screws if required. Fixing kits available see fixing section.
- Technical-The 60 mm deep steel cup is cut from 100mm x 100mm x 3mm wall steel box section. The cup is drilled with 2 No 10mm holes.The 93.5mm x 93.5mm x 3mm sole plate with a 12mm drain and 35mm post hole are laser cut to profile.The post is a 300mm x 34.5 x 2mm wall tube.The 150mm x 150mm x 3 mm base plate is laser cut with a 35mm post hole and 2 No x 12mm holes in the corners of the base plate to receive fixing bolts if required. The cup is welded to the base plate and to the steel tube. The shoe post is welded to a 150mm x 150mm x 3mm base plate.The completed shoe is hot dip galvanized.This product is designed to be concreted into the ground or fixed to a concrete base. Worked out with a safety factor of 6. Please ensure you refer to a structural engineer to ensure the product is suitable for your application.
- Price excludes delivery. Available for next day delivery.
If showing out of stock, please contact us as normally delivery can be made within 7 to 10 days.
Bulk orders please contact us as discounts may apply and the most economic delivery charges can be agreed.
Please see our range of Post Bollard bases which work with the finished sizes. Note some minor adjustments might be required on site.